Brady Road Reopened - April 3rd, 2023

Posted date
puddle with rain drops

Brady Road from Calvert Drive to Murphy Drive has been reopened.

Please be advised that the Flood Watch issued by the St. Clair Region Conservation Authority (SCRCA) and the Ausable Bayfield Conservation Authority (ABCA) is in place until tomorrow April 4th, 2023.

St. Clair Region Conservation Authority:

https://www.scrca.on.ca/flood-watch-april-2-2023-event-5.../

Ausable Bayfield Conservation Authority:

https://www.abca.ca/post/?ID=1391